Manual MSMA Print Email Ch 1 - Malaysian Perspective Ch 2 - Environmental Processes Ch 3 - Stormwater Management Ch 4 - Acceptance Criteria Ch 5 - Institutional and Legal Framework Ch 6 - Authority Requirement and Documentation Ch 7 - Planning Framework Ch 8 - Strategic Planning Ch 9 - Master Planning Ch 10 - Choice of Management Options Ch 11 - Hydrologic Design Concepts Ch 12 - Hydraulic Fundamentals Ch 13 - Design Rainfall Ch 14 - Flow Estimation & Routing Ch 15 - Pollutant Estimation Ch 16 - System Design Ch 17 - Computer Models Ch 18 - Principles of Quantity Control Ch 19 - On-site Detention Ch 20 - Community & Regional Detention Ch 21 - On-site and Community Retention Ch 22 - Regional Retention Ch 23 - Roof & Property Drainage Ch 24 - Stormwater Inlets Ch 25 - Pipe Drains Ch 26 - Open Drains Ch 27 - Culverts Ch 28 - Engineered Waterways Ch 29 - Hydraulic Structures Ch 30 - Stormwater Quality Monitoring Ch 31- Filtration Ch 32 - Infiltration Ch 33 - Oil separators Ch 34 - GPTs Ch 35 - Ponds and wetlands Ch 36 - Housekeeping Practices Ch 37 - Community Education Ch 38 - Actions to Control Erosion & Sediment Ch 39 - Erosion and Sediment Control Measures Ch 40 - Contractor Activity Control Ch 41 - Erosion and Sediment Control Plans Ch 42 - Landscaping Ch 43 - Riparian & Wcourse Mgmt Ch 44 - Subsoil Drainage Ch 45 - Pumped Drainage _revised Ch 46 - Lowland, Tidal and Small Island Drainage Ch 47 - Hillside Drainage Ch 48 - WW Overflows